As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
No Answer is Posted For this Question
Be the First to Post Answer
I need to constructive work in amaraj batteries
for mortar 1:18 how much cement and sand required for 1 CM
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
What glue is least sticky?
What is the difference between Fe500 and Fe500D rebars in their appearance and also is there any change in their Yield Strength of these rebars?
What is Well Point System in Dewatering
17. What is the thing that can disappoint you while working for a certain employer?
WHEN A RIVER STARTS MENDERING WHAT CONDITION WILL OCCUR?
how do i find the fixed end moments in the fixed beams with the use of general method?
What is thumb rule in quality and quantity estimation of a Residential building??
0 Answers Ascent Constructions,
why main steel is to be reinforced in shorter direction in case of slab?
plz send me civil q papers of hpcl