how we can calculate the quantity of sand & cement & also
Aggregate so give me to this answer for a slab
Length is : 25' /3.28 = 7.62 Mtr
Width is : 30' /3.28 = 9.14 Mtr
Depth is : 0.6"/3.28 = 0.15 2Mtr
Answer Posted / khadar babu
TOTAL VOLUME:
7.62*9.14*.15=10.44cum
(M15 concrete)
cement required= 10.44*6.48=67.7bags=3384.84Kgs
Sand required= 10.44*0.434=4.54cum
Aggregates required= 10.44*0.868=9.06cum
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What should be the standard roof height like to be?
do we decide reinforcement steel , based on bending moment ? give example with continous slab?
Explain what is zoning permit?
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data
I have an span length 16 ft c/c
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
What is the meaning of soil reinforcement?
Volume of 25kg putty bag & 40 kg putty bag volume??
Explain how you can use different dimension tools in CAD? What are the different dimensions available?
Is it possible to make a feature using an overdefined sketch?
Formula for calculating the volume of bulb in underreamed pile
Would you cause a 55-gallon drum of water to weigh more by climbing in?
Why you are leaving present job?
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?