Can anyone give me the thumb rule for calculating the time
required for construction based on quantity of concrete,
Reinforcement, shuttering, etc
No Answer is Posted For this Question
Be the First to Post Answer
What are the basic use of runners and standards of pipelines?
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
What is the cement and sand consuption of 1:4 block work
what is the difference between factor of safety and partial safety factor.??
what is the formula for lapping length
natucher of concrete &type of concrete?
How Much Anailed Wire (Binding Wire) use Per KG in Running Meter ?
Diversion of cum to cft
230mm thick brick wall 10rmt length and 4.1 mtr high brick wall. tell quantity of cement,sand,brick required? Also tell me labour required to complete brickwall in 2days
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
explain the difference between short column and long column
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)