Can anyone give me the thumb rule for calculating the time
required for construction based on quantity of concrete,
Reinforcement, shuttering, etc
No Answer is Posted For this Question
Be the First to Post Answer
rate analysis of shuttering
wha is frog?
please send the model qn paper of jindal steel power in civil engineering..
How we decide the depth and size of footing? Give a example?
methode of psc girder stressing
for mortar 1:18 how much cement and sand required for 1 CM
what"s the purpose of damp proof course (DPC)and where it"ll provide?
what is the main difference b/w compaction and consolidation
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
compression strength of first class brick should be
how to placeing reinforcement in slab?
What is construction mitigation management?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)