Can anyone give me the thumb rule for calculating the time
required for construction based on quantity of concrete,
Reinforcement, shuttering, etc
No Answer is Posted For this Question
Be the First to Post Answer
1. why we use inverted beam ? 2.why we use extra bar in beam ? 3.dimension in L-bar in column ,footing and beam
what is the tensile strength of 10swg and 8swg gabion wire?
what isIS code no for preparation of BAR BENDING SHEDULE (BBS)
difference between fc and fc'?
0 Answers Wah Engineering College,
What is m20 and What is 20 ?
2 Answers Sukhwani Constructions,
What are the grade of steel used in the steel design.?
15 Answers Engineers India Limited, L&T,
what is the unit of heat of hydration?
what is mean by splice length? As there were any formula to calculate the splice lenght?
how much quantity of cement bags are required to fill the one m3 of empty container.?
In Fe415 & Fe500,What is mean by "Fe" and "415/500"?
12 Answers CMR, Modi Builders, Taehwa Enterprises, vvip,
proportions of m10, m15, m20, m25, m30, m40, m45, m50, m60, m70, m75, m80 etc
Meaning of civil engg. in hindi
4 Answers NC Infracon, Reliance,