how we can calculate the quantity of sand & cement & also
Aggregate so give me to this answer for a slab
Length is : 25' /3.28 = 7.62 Mtr
Width is : 30' /3.28 = 9.14 Mtr
Depth is : 0.6"/3.28 = 0.15 2Mtr
Answer Posted / bala
Concrete quantity = 112.50 cft
Requried of cement = 19.11 nos bag
Requried of sand = 67.50 cft
Requried of metal = 101.25 cft
Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
Gidc technical que paper
How to build the floor to ceiling bookcase?
Describe Briefly The Various Methods Of Concrete Curing?
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?
What is the difference between undo & redo?
how to calculate the strength of rebound hammer test reading in building construction ?
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
Define What is the difference between routing maintenance and major maintenance in school facilities?
Which is the direction for positive angle?
what is floating slab foundation?
mean of NH4 pipe
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
strength vs shape factor
insted of bentonite we can use any alternate material in piling ?