how much quantity of sand,cement,reqired for 100sqft of wall construction.
And how much quantity required for plastring
Answer / ramadass
Required of cement : 33.48kg
required of sand :133.92kg
Is This Answer Correct ? | 5 Yes | 5 No |
which things consider when the calculate the area of the flat?
what is the specific gravity of cement .define it and value?
how to calculate sand, aggregate and cement in m25 concrete?
2 Answers CCL Products, Western Infrastructure,
What is quantity of Cement and Sand required for the 1 cum brick masonry with 1:6 Ratio cement mortar.
2 Answers RPP Infra Projects, SIL,
one MT of steel for using how much binding wire required?
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
Please tell me how many bricks needed for 4.5" bricks per m3(how to calculate this also), and outurn of mason. Thanks.
structural engineering based
1 cft have 13.5 No of Bricks, can someone help me to answer me for it's mathematically proof?
in how much square meter of slab we are providing a beam it may be oneway or twoway slab.