What is quantity of Cement and Sand required for the 1 cum brick masonry with 1:6 Ratio cement mortar.
Answers were Sorted based on User's Feedback
Answer / niranjan
proportions 1:6
sum of ingredients in mortar, 1+6=7
dry material required for cement sand mortar for 1 cu mec of brick work=.30 cu mec.
cement required for 1 cu mec=1x.30/7=0.0428571 cu mec.
0.0428571/0.034725=1.234 bags
=61.709 kg
sand required for 1 cu mec=6x.3/7=0.2571 cu mec.
Is This Answer Correct ? | 5 Yes | 0 No |
Answer / mohd zubair ali
assume brick size is 19*9*9 cm. and in one cum 650 bricks ,48kg of cement and 0.2cum of sand required
NOTE:-(amount of cement require =0.2*1440/6 = 48kg
constant proportion for sand is 1cum of cement mortar is 0.2 )
Is This Answer Correct ? | 4 Yes | 2 No |
the plan area of a building 10*15 of superstructure 0.30 then plinth area is
What is Rankine Cycle?
whats is the Indian standard ratio for mix design M5 M10 M15 M20 M25 M30 M35 AND M40???
what is the ratio of M10,M20,M30,M40,M50,M60 grade concrete
28 Answers NCC, PWD, SPML, Student,
How do you derive the quantity of cement & sand in brick work construction in 1Meter cube, using CM 1:6 and bricks of size 19*9*9 cm
What is the mixing ratio of M7.5,m10,M30,m35&m40?
15 Answers Reliance, Umiya Construction,
what is the comprasive stranth of brick
8. What do you find more useful in your present work – your education or your practical experience from previous jobs or traineeships?
What is the difference between RCC & PCC?
how to calculate the quantity of material in 1 cubic meter Concrete?
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
what is the diffrence between grade beam and plinth beam