design the irrigation canal(b,B,h )head is 3tms of water is
supplied to the 200hectars of area and the base period crop
is 150days dance to water travels as 35km.the canal section
is trapezoidal and also calculate the slop the canal
No Answer is Posted For this Question
Be the First to Post Answer
Explain the importance of moment of inertia?
what is the initial setting time & maximum duration concrete get hardening for ordinary portland cement?
How many feet are in 4 square yards?
What is the quantity of steel, cement, sand, and aggregate required for a 2100 sq ft Roof Slab(Residential Building) area of RCC?
how much 20 mm metal is used in M25 grade desin mix in weight and sand for 1 cubic metre
what is formula for concrete mix ratio in m20, m25 and m30?
2 Answers Reddy Veeranna Constructions,
how to find ssm in foundation?
what is isoseismal?
Name the standard sand for concrete tests
how will i find leakage in underground?
How much quantity of Cement and Sand required for Cement Sand Ratio of 1:1 and volume of pile is 0.61 m3
how to calculate the value of 162?
2 Answers GKC Projects Limited GKCPL, L&T, OPG,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)