I would like to get the formula
How can i calculate the productivity of a mason in terms of brick laying and plaster.
i have 6000 Sqmt of interlock laying work
i want to calculate
- how many masons required to do the job
- in how many days can it be done
- what will be the production rate in 8 hours shift/ per mason
if i can get some excell sheet , it will really help me in my calculations
No Answer is Posted For this Question
Be the First to Post Answer
what is the meaning of degreasing of the euipment or line.
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
0 Answers Gammon, Rajiv Gandhi University of Knowledge Technologies RGUKT,
Providing cement based water proofing treatment to terrace (Indian water proofing) with brick bats with cement morter (1:5) and (1:3). what are rate in cum or sqm.
Define What is a projection line?
what is the weight of 6000 psi concrete in lb/cft?
What are the Types Of DPC and its Thickness used?
what is main diffrence between vitrified and cremic tile????
2 Answers Colliers International,
cement and sand required for one block of size 0.23*0.15*0.46
What is the meaning and full form of FTA and MTA in plumbing material
can any one explain bar bending schedule of bems and columns and slabs ??
why & what is perchatage we are using fly ash in concrete?
Why compressive strength of only concrete cubes and cylinders tested ? why not other shapes?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)