Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how to calculate sand, aggregate and cement in m25 concrete?

Answers were Sorted based on User's Feedback



how to calculate sand, aggregate and cement in m25 concrete?..

Answer / rohit singh

Grade m25= 1:1:2 , sum=1+1+2=4
Dry concretein 1 cum =1. 52
Cement =1. 52/4=. 38*28. 8=10. 94bags cement /cum concrete
Sand=1. 54*1/4=. 38cum
Aggregate=1. 54*2/4=. 76cum

Is This Answer Correct ?    0 Yes 0 No

how to calculate sand, aggregate and cement in m25 concrete?..

Answer / narayan rijal

1.52/(1+1+2)*28.81=cement bags
0.41=sand
0.83+aggregate

Is This Answer Correct ?    3 Yes 8 No

Post New Answer

More Civil Engineering Interview Questions

if we make b.b.s then bend correction is taken how much..

1 Answers   ACPL,


what is the difference between rcc pipe (pressure or non- pressure)and rcc hume pipe?

1 Answers  


How many 6.5 * 6.5 tiles would i need for a 36-sqaure-foot room?

3 Answers  


how many express way in india

1 Answers   DVC,


in the footings first which reinforcement bar has to be layed as per design criteria.

3 Answers  


how many nos of National highway in India.

13 Answers   HBC, L&T,


What should be the PH value of water for irrigation purpose

1 Answers  


how many lab test on bricks and aggregate write briefly please

2 Answers   NPC, Omaxe,


how statics is different from dynamics

0 Answers  


What Are The Steps Involved In The Concreting Process, Explain?

0 Answers   Bechtel,


In beams why we give lap in middle of top bars and at edges in bottom bars???

2 Answers  


How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?

0 Answers   KD infra,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)