Answer / k r kumar ranjan
Normally In Coal based thermal power plant(Either Sub or Super Critical) 60% Bypass is adopted based on condenser heat load calculation keeping 0.9 as Condenser Cleanliness Factor.
If Some designer wants to bypass 100% of generated steam, it is also possible. In fact most Nuclear Steam Turbine adopt same for same reactor shutdown process.
Increase in % capacity of bypass system increases capital cost involved in condenser cooling surface, Extraction pumps, LP Heaters, Pipe Sizing etc.
| Is This Answer Correct ? | 0 Yes | 0 No |
explain how the third harmonic content of the magnetising current affects transformer design
how shall you calculate PLF on the basis of percentage auxillary load factor
.What are the equipments should run when there is a black out in power plant.
What is creep, resilience.
What will happen if id fan on boiler not functioning?.Can the Boiler run without id fan? What is the effect?
which safety valve will open first if steam is not been supplied to turbine.
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
Difference between electrical and electronics?
A 5A rewirable fuse blows when 9A flows.determine the fusing factor?
1 Answers Schneider, Student, Tata Power,
im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much
under which situation or why restricted earth fault protection operates in out side its zone that is external fault
Is it not bad to bleed steam from turbine stages before utilizing its energy.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)