why prds line tapping taken from ms line as Pri SH O/L temp & pressure is sufficient to full fill our requirement of PRDS..

Answers were Sorted based on User's Feedback



why prds line tapping taken from ms line as Pri SH O/L temp & pressure is sufficient to full fil..

Answer / hardik085

if tapping is before final super heater thatn starvation come in low temperature superheater.

Is This Answer Correct ?    5 Yes 1 No

why prds line tapping taken from ms line as Pri SH O/L temp & pressure is sufficient to full fil..

Answer / mallikarjun

For the safety of secondary SH coils.

Is This Answer Correct ?    5 Yes 2 No

why prds line tapping taken from ms line as Pri SH O/L temp & pressure is sufficient to full fil..

Answer / vikram thakur

if tapping is after primary super heater than it may cause starvation to secondary super heater, thus secondary super heater will get over heated due to lack of supply of feed water.

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Power Plant Engineering Interview Questions

how shall you calculate PLF on the basis of percentage auxillary load factor

6 Answers  


What is wheel chamber in steam turbine?is it impulse blades are called wheel chamber in the steam turbine?

1 Answers  


What is tripping relation between the turbine exhaust pressure and turbine last stage pressure....???

1 Answers   Jaypee,


what does mean by kva rating

0 Answers  


how to differentiate between "ALL fuel lost" and "All Flame Lost" in Boiler MFT condition?

1 Answers  






Need of oxygen dosing in super critical powerplants?

5 Answers  


In one plant id fan and fd fan are used for boiler. boiler is used to heat water after some days they install one tank to heat water by hot flue gases coming out from boiler and then hot flue gases are used to heat the air coming from fd fan before leaving out from chimney . but hot flue gases are not coming out from id fan what might be the reason?

3 Answers   TATA,


.What do you mean by Turbine Dump.

1 Answers  


Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.

0 Answers   OPG,


Due to the sensitive earth fault Our Power plant Get Tripped Several Times, It happens in the morning time daily, When temperature rises that means sun rises the earth fault current get lower, in this situation What should I do to get rid of this Problem?

2 Answers  


what's interlock relay ?

3 Answers   International Mega Food Park Limited, National Power Training Institute NPTI,


what equipment is most efficient in power plant?

4 Answers   Adani,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)