Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why Subcritical has 60% condenser capacity

Answer Posted / k r kumar ranjan

Normally In Coal based thermal power plant(Either Sub or Super Critical) 60% Bypass is adopted based on condenser heat load calculation keeping 0.9 as Condenser Cleanliness Factor.
If Some designer wants to bypass 100% of generated steam, it is also possible. In fact most Nuclear Steam Turbine adopt same for same reactor shutdown process.
Increase in % capacity of bypass system increases capital cost involved in condenser cooling surface, Extraction pumps, LP Heaters, Pipe Sizing etc.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the basic use of power plant in equipment

1746


operation

1888


What is difference between secondary Air & Tertiary Air and Their use.?

2003


why do you consider yourself a suitable candidate for this position

7445


Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.

2413


what does mean by kva rating

1504


Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.

3403


can dp type level transmitter work in under vaccum condition

1987


LAPT working in alternator / generator

3620


Why superheated are started before I'd and rd fan?

2179


im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much

2000


what is the trip circuit supervision in an electrical meaning?

2118


why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.

3248


How to calculate power press toneage

2057


procedure of how to generate power in solar plant.

1950