for 100 sqm cement concret (1:2:4) 4cm thick floor,the
quantity of cement required is
Answer Posted / ketan shinde
100×.04=4cu.m of wet concret
To produced 1cu.m of concrte 1.54cu.m of dry concrte required
1.54×4=6.16cu.m
6.16/1+2+4=.88 cu.m of cement reqd.
.88×1440 (densityof cement)=1267.2 kg
Or
1267.2/50kg =25.34=26 bag of cement
| Is This Answer Correct ? | 31 Yes | 9 No |
Post New Answer View All Answers
how many tonnes equals to one cubic feet?
pile load testing procedure
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
how many digree of freedom in four bar chain
What is the l/d ratio of cantilever beam?
How many mortar required for Brickwork of 1 Cu.m works??
satart to end steps by step process of building construction...? i want to planning theme accuretly
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
how much percent are used 20mm,10mm?
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
Which code is used for tor & tmt steel bar?
How to find the cuplock pipe qty in staging for Minor bridge?
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon