Answer / manish bagga
suppose size is (200*300),Cover is 25mm ,than
200-50=150
300-50=250
than, (150+250)*2+Displacement lenth(10D)
Cutting Length=880
where, dia of stirrups bar =8mm
Is This Answer Correct ? | 25 Yes | 9 No |
Answer / er shalu verma
C=((B-COVER)+(D-COVER))*2+18*d-2*d*NO OF CORNER's 90 DEGREE
BEND
WHERE,
B= BREADTH OF RECTANGULAR BEAM
D= DEPTH OF RECTANGULAR BEAM
d= DIA OF BAR
Is This Answer Correct ? | 15 Yes | 4 No |
Answer / rishiv
[2(a+b)]+[2*10*d]-[2*no. of bends*d]
a=height-2*cover
b=width-2*cover
d=dia of bar
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / sridhar
size of Beam - covers of both side
Length of stirrup = 2*(L+B)+ (2*12dia of bar)- (3d * 5 )
Is This Answer Correct ? | 7 Yes | 5 No |
form work including the props can be removed from beams only after
what is the diffrence between grade beam and plinth beam
How much material will consume for following specification water tank (9*7.5*6 feet)?
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
What's mean fe of steel?
1 Answers Fernas Constructions,
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
what do you understand by M25 concrete
SHEAR FORCE AND BENDING MOMENT DIAGRAMS
Which stone is best for wall construction Laterite Stone or Cement Blocks
How much steel required for 1 sq. meter area?
1 Answers Aditya Constructions,
please know me that required quantity of cement , sand , water and bricks for 1 cub meter of brick work