for 100 sqm cement concret (1:2:4) 4cm thick floor,the
quantity of cement required is

Answer Posted / pankaj tiwari

100x.04=4m3
Nominal Mix 1:2:4 Ratio 1m3 Cement Consumption =312.68kg/m3
4m3 Concrete in Cement Required =1250.72kg

Is This Answer Correct ?    0 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?

1488


How can you distinguish between sorption, absorption and adsorption?

845


How many mortar required for Brickwork of 1 Cu.m works??

1135


What happens to Load at yielding ?

1020


how much need sand and cement for 1 cft roof construction?

4053






how much required strength of cement concrete bricks(size 230x115x75mm)

1674


.5Ast

1432


rimmer in pile foundation

2385


is concealed wiring a problem in fly ash brick wall?

2180


What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?

3000


what is conrete grade ,how are depent on concrete grad and size of concrete?

2164


Explain what are the problems one might face while having a Cantilever balcony?

937


Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.

1812


What is hybrid foundation?

778


what is Quantity of stone and sand required for one cubic meter of stone work (UCR)

1734