Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

for 100 sqm cement concret (1:2:4) 4cm thick floor,the
quantity of cement required is

Answer Posted / pankaj tiwari

100x.04=4m3
Nominal Mix 1:2:4 Ratio 1m3 Cement Consumption =312.68kg/m3
4m3 Concrete in Cement Required =1250.72kg

Is This Answer Correct ?    0 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?

2187


Why nautical mile is different from statute mile?

1265


What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)

2482


You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.

2194


What is the formula for figuring out how many gallons of water are in a pipe by the foot?

1123


what is the theoritical percentage of concrete cubes testing per day?

5109


What is Curtailing of R/F

2458


If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?

1824


can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com

2502


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

2116


Explain major difference between auto level and dumpy level?

1190


how to calculate testing date

1674


How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.

2302


Is there any course for billing available in Mumbai? If yes then please mail me the details..

2222


how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high

1899