for 100 sqm cement concret (1:2:4) 4cm thick floor,the
quantity of cement required is
Answer Posted / adil mahmud
1285.71kg
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is Joule Brayton Cycle?
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
What is the use of array command?
how to clculate the %of concrete strenght achive after curing?load
how to caliculate required amount of cement and sand required for 1cu.m.
What is componsation
What is the minimum size of the particles of silt soil?
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
strength of bitumen concrete with 80-100 & 60-70 grade bitumen
Why the finite element method is lower bound solution?
Material calculation of cm 1:6 for 1sqm
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
What are the skills required to become an architect?
define the strength
Slab quantity