Answer / kuldip_1973

Consolidation and Compaction both terms are used in soil
mechanics. To understand these terms we should understand
that Soil is made up of 3 main elements : Soil particles,
air voids & water voids.

Compaction is an act of squeezing air voids and thus
decreasing the soil volume and increase its density. This
is often done using roller or vibrating instruments.

Consolidation is an act of squeezing water voids out of the
soil. The equipments used are almost the same but drains
are also installed to faciliate expulsion of water. Whether
a Civil Engineer will use compaction or consolidation for
particular soil will depend entirely on the characteristics
of the soil.

Is This Answer Correct ?    34 Yes 0 No

what is the main difference b/w compaction and consolidation..

Answer / harikiran gowda n

Compaction is a fast process which removes air voids by
using instrument such as roller etc...

Consolidation is slow process which for the removal of voids
by using water.

Is This Answer Correct ?    8 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

what is the m25 test result 7 days 14 days

3 Answers  


what is the name of shuttering oil used in oman

0 Answers  


how to calculate 1 cubic meter rcc concrete 1:1.5:3 ratio ,how much aggrates and sand , quanitites

3 Answers  


If your drg told used 600 dia hume pipe for culvert but due to market problem available 300 dia hume pipe,den how much humepipe you provide(300 dia) instead of 600 dia?

1 Answers  


1 cubicmeter liquid = how much litre

6 Answers  






Can anyone tell me the salary and job profile of transportation engineers/transport engineer?

1 Answers  


How much quantity of coping is done per day by one mason in Rmtr?

2 Answers  


How to calculate canal slope curvature qty!

0 Answers  


concrete mix design for M 30 Grade

9 Answers   PWD, TATA,


asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream

0 Answers  


how to consider the lap length of a bar in IS code and specify the code book name and clause& page number?

2 Answers  


Why we are using 150 mm X 150 mm X 150 mm cubes for testing the compressive strength of concrete in CTM and why not other sizes?

1 Answers   BARC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16637)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)