Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Why we are using 150 mm X 150 mm X 150 mm cubes for testing
the compressive strength of concrete in CTM and why not
other sizes?



Why we are using 150 mm X 150 mm X 150 mm cubes for testing the compressive strength of concrete in..

Answer / ratheesh

concrete Cube mould size is 150 X 150 X 150 and 100 X 100
X100mm.

Mostly site construction are using 150mm mould only, but
some RMC company's are using 100mm mould.
Cost deduction is the only reson.

Is This Answer Correct ?    5 Yes 13 No

Post New Answer

More Civil Engineering Interview Questions

Hi, Please tell me the ISI specification for the duration of concrete to achieve full strength of concrete. Is it 28days?

7 Answers   UPSC,


In the roof of a pumping station explain briefly the components of a waterproofing system?

0 Answers  


How do we say The LAP LENGHT is 50D to 60D ?????

3 Answers  


What does a construction cost covers and what does not?

0 Answers  


How and where from do we get 162 for calculating sectional weight of TMT

1 Answers   Ankit Metal Power,


what are the various types of pile foundation? explain with introduction

5 Answers  


what is the painting co efficient of slope roof tiles?

0 Answers  


How do you compute volume of airflow?

0 Answers  


compare the cost of construction of a building by cement and one in which cement is substituted by fly ash.

2 Answers  


A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx

0 Answers  


What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?

0 Answers   CECL, HTC,


how to calculate valuation for the old building?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)