what is the m25 test result 7 days 14 days
Answers were Sorted based on User's Feedback
For the concrete with different grades the strength development for 7days is approximately 60 to 70% of its 28days characteristic strength.
Is This Answer Correct ? | 14 Yes | 4 No |
Answer / imran
Ok fine let me start with 7 days strength, the provision of 7 Days Strength is now ended over Globally, else in previous version of IS was two third of the characteristics strength and 100% of characteristic strength after 14 days.
There Fore the Deflected Strength for M-25 in:
7 Days 16.67 N/mm2.
14 Days 25.00 N/mm2
28 Days 28.00 N/mm2 (As per Latest Revision of IS 456 Fck + 3)
Is This Answer Correct ? | 2 Yes | 1 No |
Answer / santo.m.f
M25 test result at 7 days is of its 65%. ie; M25:-16.25 N/mm2. then 14 days 90%. ie; M25:- 22.5 n/mm2 .
Is This Answer Correct ? | 0 Yes | 3 No |
what is the factor of safety for cement and steel with reference to IS 456-2000. and min reinforcement should be provided for column and slab with reference to IS 456-2000.
Explain what is the difference between built area and super built up area?
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
what is the function of fineness modulus to determine the concrete mix?
How did street originate in the plumbing term street ell?
Difine coffer dam ?
What are the different grades of concrete ?
Which types of Water Proofing to Be used in Swimming Pool.
2 Answers CCEL, Ideal Construction,
(Project Management Topic) What are the important criteria in the successful realization of the project?
what is the meaning of W.T.S this is written on structural Drawing