How much quantity of coping is done per day by one mason in
Rmtr?
Answers were Sorted based on User's Feedback
Answer / n.v.ramana
30rmt depending upon the height and site condition.
Is This Answer Correct ? | 0 Yes | 1 No |
why we take cube depth 150mm for testing
Generally construction is based on which method:limit state of working stress
3 Answers Mars Planning Engineering Services, Sterling Wilson,
WHAT IS TEAM SIZE IN CONSTRUCTION WORK
What is the mix ratio by volume of concrete grade 45
why don't we need shear reinforcement in slabs?
How much cement ,steel bar, concrete ,required for 416 cum rcc slab
what is the measure of slump
why seismic analysis not done during design of slabs
What is meant by hydration of cement??
please differentiate duties and responsible for civil site engineer , Quantity suryevor ,Quality control engineer and Planning engineer
WHAT HAPPEN WHEN USING OF LARGEST POSSIBLE MAXIMUM SIZE AGGREGATE RATHER THAN SMALLER AGGREGATE IN RCC ?
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.