Water cement mixing in hopper less mixture machine is
better than hopper mixture machine because:
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
Explain how you can use different dimension tools in CAD? What are the different dimensions available?
what is the formula of concrete quantity
4 Answers NKB, Soma Enterprises,
What is the rate of earthwork excavation?
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
What is the deffrence multistory bulding &highrise bulding
what is the procedure of plastering..?
how to calculate cutting length in bar bending schedule for 180 degree bend? for 90 degree bend we take 2d i.e we -2d for 180 degree ho much ? question asked at l&t
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
how to calculate the runner (2*3) qty in cft. the length is 8 feet.
6 Answers CCCL, Gammon, Greenko, L&T,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)