Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is the rate of earthwork excavation?

Answers were Sorted based on User's Feedback



What is the rate of earthwork excavation?..

Answer / abhas

120 Rs/cubic meter

Is This Answer Correct ?    28 Yes 12 No

What is the rate of earthwork excavation?..

Answer / vishnu

125 Rupees per Cubic meter

Is This Answer Correct ?    25 Yes 11 No

What is the rate of earthwork excavation?..

Answer / arun

210

Is This Answer Correct ?    7 Yes 0 No

What is the rate of earthwork excavation?..

Answer / shreedhar narayan bapat

One Labor digs 1 cubic meter earth in one day. His per day charges will be Rs.200 But If the same work is done with foklen or JCB charges will be lower hence the charges of Rs.125/- per Metercube are reasonable.
my proposal is firstly all farmers be provided with jalshiwar of 10,00,000 Ltr.i.e 1000 Cubic meter at the cost of Rs.1,25,000/- sufficient for 1acre farm
The farmer can be provided with 10,00,000 liter water at Rs.1,00,000/-
With this water The farmer shall produce rainy season crops plus rubbi crop or vegetable crops. Many farmers have earned
at least 4 lakh Rupees./acre.with less water.
suppose the necessary loan is given by local Gov.district bank.
the gross overall income of the farmer can be Rs. 400000/-
Considering that Rs.50000 is expended for organic manure and labor. and the whole amount of Rs.250000 (capital + interest ) the farmer earns Rs. 1 lakh in first year and next year at least Rs.300000/-and so on.
If gov concentrates on all rivers and deepan the rivers by one meter and provides just one meter bunds (without widening the rivers)throut the river beds for all rivers in Maharashra the water availability could be much more due
to rain collection in jalashiwvar and the rivers.By this way all the villages can be water sufficient in next yearJune 2016-May 2917,
Hence Gov.should take up the work on War Footing so that the farmers of 2 crore hector will earn Rs.20 lakh crores
inthe year 2016-17.

S.N.Bapat

Is This Answer Correct ?    3 Yes 0 No

What is the rate of earthwork excavation?..

Answer / shreedhar narayan bapat

Further to my previous answer,I want add that by way of cultivating fruits/vegetables with simple drip irrigation enthusiast farmers have earned at least Rs. 2/- per liter of water.You can find this on internet web -successful farmer of India-

S.N.Bapat

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

where should the lap of a beam should be

1 Answers  


What was asked in isro civil interview

0 Answers  


M30,M35,M40,M45 how much ratio

3 Answers   JMC, JMC Projects,


Why Vitrified tile are getting pop up.

0 Answers  


How much quantity of rod binding work by a rod binder per day

0 Answers  


in steel bar weight formula (d^2/162).so what is 162.

6 Answers   KPTL,


Currently how much cost are coming in residential building per sqm with material & Labour rate in Delhi,NCR

1 Answers   NICE,


i Have Completed a Intermediate Vocational (Construction technology) with Bridge course ,iam elegible to join in Institute of Surveyors(india).

3 Answers  


What is mean by grade of steel?if Fe 415,Fe500- what is this 500 and 415 denotes?

3 Answers   ECC,


what is the praposion of M30 concrete mix.

6 Answers  


What are some structures that may be subjected to fatigue?

0 Answers  


what is difference of NP3 and NP4 pipe and what is the thickness of 1000mm dia NP4 pipe

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)