What is the rate of earthwork excavation?
Answers were Sorted based on User's Feedback
Answer / shreedhar narayan bapat
One Labor digs 1 cubic meter earth in one day. His per day charges will be Rs.200 But If the same work is done with foklen or JCB charges will be lower hence the charges of Rs.125/- per Metercube are reasonable.
my proposal is firstly all farmers be provided with jalshiwar of 10,00,000 Ltr.i.e 1000 Cubic meter at the cost of Rs.1,25,000/- sufficient for 1acre farm
The farmer can be provided with 10,00,000 liter water at Rs.1,00,000/-
With this water The farmer shall produce rainy season crops plus rubbi crop or vegetable crops. Many farmers have earned
at least 4 lakh Rupees./acre.with less water.
suppose the necessary loan is given by local Gov.district bank.
the gross overall income of the farmer can be Rs. 400000/-
Considering that Rs.50000 is expended for organic manure and labor. and the whole amount of Rs.250000 (capital + interest ) the farmer earns Rs. 1 lakh in first year and next year at least Rs.300000/-and so on.
If gov concentrates on all rivers and deepan the rivers by one meter and provides just one meter bunds (without widening the rivers)throut the river beds for all rivers in Maharashra the water availability could be much more due
to rain collection in jalashiwvar and the rivers.By this way all the villages can be water sufficient in next yearJune 2016-May 2917,
Hence Gov.should take up the work on War Footing so that the farmers of 2 crore hector will earn Rs.20 lakh crores
inthe year 2016-17.
S.N.Bapat
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / shreedhar narayan bapat
Further to my previous answer,I want add that by way of cultivating fruits/vegetables with simple drip irrigation enthusiast farmers have earned at least Rs. 2/- per liter of water.You can find this on internet web -successful farmer of India-
S.N.Bapat
| Is This Answer Correct ? | 0 Yes | 1 No |
If do cube Test for 28 Days,when shall can do testing? after completion of 28 days it means 29th day or 28th day which one correct?
Cemen-1 Fine agr.-2 Core agr.-3 calculate for per 100 qube feet (qubic feet wise)
what's the formula for calculate pcc for matt(45mm aggregate)?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
Previous IS steel code?Thanks.
7. Do you apply the skills and knowledge learnt at school in your work?
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
What is Rankine Cycle?
What is the exact definition of national highway. What is the difference between national highway n any other road?
What is the difference between Stress & Strain?
during earth quake base shear force=a/w*g Comment?
9*9 1:4:8 ratio using how to calculate the material for 40mm aggregate ,cement &sand please tell me answer
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)