how to calculate the runner (2*3) qty in cft. the length is 8 feet.
Answers were Sorted based on User's Feedback
Answer / kishor kumar.
Runner is the wooden
material. The question is
(2*3), it mean 2in.*3in. First
of all convert this variable in
terms of foot. Then davide it
with third length.
| Is This Answer Correct ? | 21 Yes | 8 No |
How to calculate brick work quantity?? Block work quantity??
what is the minimum compressive strength in 7 days for m20,m25,m30
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
how to reduce heat of hydration in concrete?
define formwork
what is mean by reestimation?
0 Answers Ste Infrastructure Pvt Ltd,
what is the meaning of W.T.S this is written on structural Drawing
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
From where the relationship of target strength comes in mix design(graph)
23. If you had enough money to retire right now, would you?
What is kn measurement?
I need to plaster an area of 1500 square meter. how much quantity of cement and sand need for this.?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)