what is the amount of absorption of slurry in shuttering ply
board.
what is the amount of slurry leakage allowed for 1 m3 of
concrete.
No Answer is Posted For this Question
Be the First to Post Answer
1.(a.) how do you calculate the volume of mortar for 1 piece of block 450mm x 225mm x 225mm. (b.) calculate for 1sqm
How should i calculate Cutting length of haunch bar in a raft including cover?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
sir, whitch is the best book (writer name) for prepration of gate....
Column is a compression member then why we provide reinforcement on column?
1 Answers Simplex, Thermax, Vihaan Group,
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
what is ph value of water
M25calculate of formula which in kg cement of 1cum
What is the proportioning by weight of 1:2:3 concrete mix design of cement, sand, gravel, and water in metric for a 3000 PSI concrete strength and a target slump of 75-100mm?
Please provide detail I.S standard code for using crush sand instead of river sand for plaster and concrete grade M15, M20, M25 and M30 and its mix design
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
0 Answers GVR, Howe Engineering, L&T,
How to arrive dry volume of concrete (1.52 to 1.57) ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)