i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
No Answer is Posted For this Question
Be the First to Post Answer
how cubic feet cement,sand,aggregate required for 1 cubic feet ratio=1,1.5,3
Given a selection of 28 day cube test results for concrete placed of design mix C 35 and not all of which are greater then 35 MPa, how does one decide if the concrete in place is satisfactory. Are there a minimum number of cubes that need to be tested to decide that?
how to check and keep control on the wastage of material at site
0 Answers Aashray Design Consultants, ABC Infra, Jain Group,
How many cncrete grades are used for construction,explain with proportion,grades and where it used
what is studds? where it can be done?
Please provide detail I.S standard code for using crush sand instead of river sand for plaster and concrete grade M15, M20, M25 and M30 and its mix design
1 Answers JPMorgan Chase, Sobha Developers, Structwel,
what mean By core Billing
How Calculate Lap Length
Why can i adopt concreting insted of rubble solling in beds? In comoarision concreting is cheaper than the soling.
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
Explain what is progress payment?
percentage of wastage limits in construction materials EX : min & max . cement = fine aggregate = coarse aggregate = admixture = wood = tiles = painting = marbles = bricks =
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)