What is unit costing & what is standard cost? Is it the
same ?
Answer / sanjeev
Unit cost is nothing but it is cost estimation of any product as (product cost = Material + Labour + Overhead)
After actulization if there are varience in cost as plan Vs. Actual cost then reason would be below for the same.
May result from either higher than expected use of indirect materials,indirect labor or supplies or increases in indirect manufacturing costssuch asfuel
Regards,
Sanjeev
Is This Answer Correct ? | 1 Yes | 1 No |
Are there distinct kinds of activities in a project?
You want to lock two wbs items say overheads and other expenses so that the user can not release pr. How would you do that?
How to set field status of wbs as mandatory, (wbs element, and ntw) ?
What is project definition?
How is the “activity time” estimates done?
Can anyone post the SAP-Project systems interview questions.
What do ntw mean?
Can revenues be linked with activities?
How can PS be linked to COPA? How will the settlement take place in this case (when PS is linked to Controlling through COPA)
What are settlement rules?
Forming a team, developing the team and improving knowledge are direct responsibilities of the project manager, do you agree?
What is the menu path & t. Code for defining special characters for projects?