Answer / siva
MAXIMUM OF 8 LEVELS ARE APPROVED IN RELEASE STRATEGY
Is This Answer Correct ? | 7 Yes | 1 No |
Answer / sureshkumar
8 Levels allowed but, if in case we required one more approval what we will do??
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / shoukat moazzzam
Based on my experience, a maximum of 8 levels of approval is allowed.
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / praveen kareti
SAP Standard 8 levels of approval in release strategy
Is This Answer Correct ? | 1 Yes | 0 No |
what is change request?what is create request?what is own request?when coustamised data is saved a popwindow appears as promt for customisation in that 2 fields display own request n create request for what it is used?plz clarify
which is the movement type in SAP whiihc do not have a reverse Movment type? E.g. 101 has reverse 102.
T-code/procedure for extend the material to other (new) storage location within the same plant
Can anyone plz tell me what is a procedure( in detail step by step ) to migrate from tax procedure TAXINJ to TAXINN ?
In release procedure in purchase requisation,i have two strategies in p.r, SRATEGY 1:P.R value is 0-10000, STRTEGY 2:P.R value is 9000-20000. if your P.R value is 9500 which srategy is taken in P.R.
What controls the order in which the approval must take place?
What is the movement type used in receipt of RTP?
What about standard edition (initiate) users?
How to determine the vendor in pr automatically?
What are the different sections in vendor master data?
Is there any procedure for amendment of power? If Pl. X-Plane?
What is the difference between LSMW and CATT?