the distrubution system in water supplies is designed on
the basis of
avg daily demand
peak hourly demand
coincident of draft
greater of B & C
No Answer is Posted For this Question
Be the First to Post Answer
How much binding wire required in 1 MT Reinforcement? How much Nails Required in 1 Sqmtr Area work progressed
in 1:4,1:6 and 1:8 cement mortar mix how much water required? and find water cement ratio?
Geometric Design Related Code name in India.
In a concrete grade C35A, C & A stands for what and equalent cube strength?
what is ment by water cement ratio
2 Answers CSIR, GIPL, Madhucon, NBCC, TCS,
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
why are you joining in this (applied post) job and your aim for this job
What is hybrid foundation?
concrete cube strength if fail 1 no in 7 days .What is the solution
how many 1st class bricks in 1cu feet?
28 Answers ECCI, Jayant Group, L&T,
sir how can we find the cement and sand required for making 4" drop
Explain what is Critical Path Method (C.P.M)?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)