Answer Posted / ptcool
rigid pavement is nothing but the pavement made of cement
concrete slab.similar to the flexible pavement it also
consist of a subgrade,base course; oly the top course
varies.The top course will be asphaltic or bituminous
material for flexible pavement and cement concrete in case
of rigid pavement.The cost of construction of rigid pavement
is quite large.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
PL.tell me about civil engineering questions with answer
What do you mean by the word 'shear'?
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
why does the most of civil engg is not intersted to going for teaching field?
How will be cutting in timber plate size 600*400 column size
How do you calculate load bearing capacity of a waffle slab?
How do you calculate reinforcement weight of steel?
What is packing Factor ?
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
What are the alternate material for steel, Sand and aggregate
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.
why we use 19x9x9and 20x10x10 but not other