Answer Posted / ptcool
rigid pavement is nothing but the pavement made of cement
concrete slab.similar to the flexible pavement it also
consist of a subgrade,base course; oly the top course
varies.The top course will be asphaltic or bituminous
material for flexible pavement and cement concrete in case
of rigid pavement.The cost of construction of rigid pavement
is quite large.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
what motivates you to do a good job
225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?
why the profile of shell of natural draught cooling tower is hyperabolic.
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
how to identify the failure of building by expansive soils
Reinforcement details at hinged joint
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?
how to calculate the concrete mix m30 by volume
what is civil enginnering & what you need of this course?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
What is the coeffiencent Friction Angle between Steel and Ashphalt?