What is the volume of sand in per cubic meter if we have a design mix of concrete is 1:2:4 (by volume).
Answers were Sorted based on User's Feedback
Answer / wajahat
dry mix volume=1*1.5=1.5m^3
volume of sand=1.5*(2/7)=0.4285m^3
Is This Answer Correct ? | 6 Yes | 2 No |
Answer / ravi
i have one doubt in quantity calculation.
if we calucalate the quantity of indivisulal material to one cubic meter... if add the all material it excess to the one cubic meter so how it is considering.
pls solve my doubt.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / saurabh dhanotiya
M15-1:2:4
Total volume-7
Cement required-(1/7)*1.57=.224m^3
Density of cement-1440*.224=322.97 kg/m^3
No of bags-6.45~7 bags
The standard volume of dry mix mortar..1.57
Can check if in it code also
Sand required-(2/7)*1.57=.448×1600=717 kg/m^3
Aggregate required-(4/7)*1.57=.897*1500=1345 kg^3
Water-150-180litr
Is This Answer Correct ? | 1 Yes | 1 No |
Answer / shamsideen mohammed sakwa
1:2:4=7, let's assume the area to be plastered is 100m2
0.012*100=1.2m3
2/7*1.2=0.3428572
You divide your ans by the volume of the tipper per trip,
0.3428572/3.82m3 per single trip
=1.3097145
Approximately = 1.31
Is This Answer Correct ? | 0 Yes | 0 No |
Which factor affects the use of GSB material for different types of road works? What makes a material suitable to use for GSB??
how can we determine the quantity of steel bars in a structure? is there any formula for determing the number of bars required ?
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
0 Answers Vishal Pipeline And Engineering,
What are your future hopes for this job?
why moment is create in fixed beam. And why moment is not create in simply support beam
how much kgs should Cement,sand & aggregate to be added for 1cumt,mix is M15,M20,M25,M30
What is Aggrgate sizes used in a WMM Plant?
what is the types of door's wood?
how do we design mix ratio?
I have used the proportion of cement:sand:gravel, is 1:2:4. cement and the sand was provided by the company but i provided the gravel. this combination was used to fill 500 cubic ft of wall. now i want to know how much gravel was used in making the wall. can you guys please help me?
What are segregation and bleeding?
wat is fe full form in fe4l5?