What is the volume of sand in per cubic meter if we have a design mix of concrete is 1:2:4 (by volume).
Answer Posted / ravi
i have one doubt in quantity calculation.
if we calucalate the quantity of indivisulal material to one cubic meter... if add the all material it excess to the one cubic meter so how it is considering.
pls solve my doubt.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
The concrete slump recommended for beams and slabs; is?
undistributed samples are obtained by
Aptitude, reasoning, quants, verbal and technical question
What are the advantages of cad software’s?
Define What is an ice dam sock?
Prepare a Schedule for a Highrised building from starting stage to Handover?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
How to plan a project
Explain what is Critical Path Method (C.P.M)?
What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)
What are some facts about concrete?
I want to join bhel because
Define mirror?
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?