What is Architect-Prepared Contract?
How to calculate the amount of cement & sand required for plastering work with ratio 1:4 please give me an answer with detailed step.
6 Answers DSR Management, Simplex,
what are the types of roads?what are the types of highway?
What are the defects in concrete?
# 1, What should be the Maximum Water observation of wood # 2. Is Alluminium is an alloy or not
how much distance to provide lap lengths in footings,plinth beams, columns, beams& slabs
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
what is the proportion of M25 geade cincrete.?
may i know the detailed description of cutting length
what is the minimum and maximum water cement ratio
Explain the various methods of concrete curing?
give me an example of finding depth of foundation
How to calculate the quantity of cement,sand,aggregate for the area L*B*T are 15.24 m*21.36m*0.12m in the ratio 1:2:4 can any ine explain in detail by using formulas. Thanks in advance