Dear sir, What is the procedure for total station?How to calculate?..

Answer / kumars

TOTAL STATION IS AN INSTRUMENT TO DO SURVEY WITH CO-ORDINATES.
TOTAL STATION USES FOR GRID MARKING , LEVEL MARKING, BASICALLY IT IS A SURVEY INSTRUMENT ABOVE THE THEOD & LEVELING INSTRUMENT.


FROM KUMAR

Is This Answer Correct ?    17 Yes 2 No

Dear sir, What is the procedure for total station?How to calculate?..

Answer / sundarapandiyan

the total station is instrument that used in surveying work. the instrument is must required 2 reference point for as a reference. the instrument is based on grape point like N and E point. it is used to provide marking of column . footing, beam even in curve, and road outer line and pipe alignment etc.,

Is This Answer Correct ?    6 Yes 1 No

Dear sir, What is the procedure for total station?How to calculate?..

Answer / abhishek raj

TOTAL STATION IS BASCIALLY A SURVEY INSTRUMENT,WHICH IS USED
FOR LONG DISTANCE SURVEYING..!!!!

Is This Answer Correct ?    5 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38

0 Answers  


what is Short bored pile foundation.

0 Answers  


What is Lap Length??????

24 Answers   CCCL,


How will find compresive strenth of M20,M25,M30 after 7day,8day 28day etc please drive step by step not shot?

2 Answers  


psc girder detail

0 Answers  






10'0" × 10'0" Proposed room Start and Finish How many Cement & Sand & Bricks & Metals & Steels Need

1 Answers   PT Builders,


what is pqc

0 Answers   Student,


what is the formular for measuring minimum depth of a foundation

3 Answers  


Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.

0 Answers   L&T,


In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.

0 Answers  


what is meant by MIS report

7 Answers   HCC, RiceLake,


how to compute slab reinforcements on step by step procedures??

1 Answers   Juniper Networks,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)