how to calculate shuttering design & position & quantity of
props & type of method for succsessful work
Answer / guest
First calculate the area of form works and divided by
300mm.That is the quantity of props
| Is This Answer Correct ? | 2 Yes | 4 No |
explain how to calculate top and bottom diagonals for transimission line tower foundation with prop setting
what is the lap length on column? state the farmula plz with explaination.
what is the max spacing of 2 columns upto which there is no need to put beam betwn dem.and how to fix the location of columns and beams in home construction.
How much binding wire required in 1 MT Reinforcement? How much Nails Required in 1 Sqmtr Area work progressed
how many cement bags in 1m^3 cement concrete in all grade
what isIS code no for preparation of BAR BENDING SHEDULE (BBS)
what is the diffreance between 1 way slab& 2way slab?
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?
purpose of binding wire in RCC. Structually is there any requirements that how to tie the binding wire like cross or single or how many pices combine together to bind the steel. i need structually importance of binding wire.
what is means of M50,M20,M15 like this please tell me ?
how to find fineness modulus of sand?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)