Answer / guest
First calculate the area of form works and divided by
300mm.That is the quantity of props
| Is This Answer Correct ? | 2 Yes | 4 No |
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
How to calculate Volume of Wet cement concrete for a specific grade?
Use of coping on terrace wall and in 4" wall is compulsory or not ?
shearing strength of cohesionless soil depends upon dry density rate of loading confining pressure all above
how cubic feet cement,sand,aggregate required for 1 cubic feet ratio=1,1.5,3
is there any information regarding MPSC2010
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
0 Answers Hashmi Constructions,
state the difference between direct and indirect cold water supply scheme
What is thumb rule for deep trench excavation
tell me how to calculate by weight and by volume the quantity of cement sand mortar of 1:2
Define What is passive earth pressure ?
WHAT IS DIFFERANCE BEWTWEEN NP2 AND NP3 OF RCC HUME PIPE?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)