how to calculate shuttering design & position & quantity of
props & type of method for succsessful work
Answer Posted / guest
First calculate the area of form works and divided by
300mm.That is the quantity of props
| Is This Answer Correct ? | 2 Yes | 4 No |
Post New Answer View All Answers
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
how to caliculate required amount of cement and sand required for 1cu.m.
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
What is the basic difference between OPC
What are the responsibilities of a site manager?
how to control PQI (Project Quality Index)
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
how do we design mix ratio?
what is column foundation
what is the water-cement ratio of mix design while 30mpa in 7 days?
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.