HOW MANY CEMENT BAGS ARE REQUIRED FOR 1m^2 PLASTERING AREA?
Answer / kaushik shah
if we do sand faced plaster 25mm thk then cement bags are
required 0.32 bags per sqm.
for 20mmm thk cement plaster 0.25 bags per sqm.
| Is This Answer Correct ? | 9 Yes | 4 No |
What do you understand by “preset” during the installation process of bridge bearings?
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
how much quantity of blocks, cement and sand is required to complete 1sq.m of CC Hollow blockwork. Size-16"x8"x8". Also what is the cement sand ration commonly used?
10 Answers ACC, CCCL, L&T, MFAR, Shoba Devlopers, SLS Developers,
what is ratio of M40?
what means if slump is less than 25mm and greater than 80mm?
plz.show development and anchorage length in simple diagram.
What is the maximum allowable 'Silt content' in River sand
16 Answers IVRCL, Om Buildcon,
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
Why alternate bars are given bent-up in slab and how to decide the length of bent up?
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
what are the volumes of soil stabilization mix of cement,lime and sand in the ratio of 1:1:10 respectively in 1m3?
What are the steps involved in the concreting process?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)