If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
No Answer is Posted For this Question
Be the First to Post Answer
I what know about life time of frp tank plz explain about it specifications & other details
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
Define What are the reasons for geotechnical site investigations in Uganda?
if 6.0M x3.0M Boat floating on water One person Sit on Boat Then the boat Sink about 15cm .Then what is the wt of person.
Why we select pile foundations
What is the difference between a wood shake and wood shingles?
what is westage % for steel, concrete,tiles,pains as per indian staderd code?
6 Answers DLF, Engineering, Lodha, Tata Steel Limited,
How much is the curing time period?
For making a new road in a village having a school & hospital , tell the steps of construction systemically ?
0 Answers UPSSSC Uttar Pradesh Subordinate Services Selection Commission,
How much quantity a carpenter can do in a day
What is IS Code ? And What is IS - 9301 ?
is basic cost of the material includes tax?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)