1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0 = answer??? pzl tell the rite answer ??
Answer Posted / partha mitra
Ans. must be 14.but the question is we r engineer or not?if
we r engineer then we should give the right ans. if we r
not knowing the ans then we should avoid it.,this is the
good website,so pls. dont put such type of silly question
here.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Why Vitrified tile are getting pop up.
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
For what purpose bedding is used under storm water drains?
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
how i can tak Quantity of mortar in block work
what is meant by csr in foundation? what is sbc?what is meant by contour line?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
what is difference between GTS bench mark and temporary bench mark
Will water damage concrete?
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress
What is the basic difference between OPC
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
Prepare a Schedule for a Highrised building from starting stage to Handover?
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs