1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0 = answer??? pzl tell the rite answer ??
Answer Posted / mallu (engg)
answer will be "0" always,,,,,,,
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
in one SQM plaster how much Cement and sand consumed in ratio 1:4
Formula of area of crane hook
explain what do you mean by the property development.
construction workers how much time take one work or qty
Difference between pre-tensioning and post-tensioning.
what are the duties of Site Engineer in work site?
what is the water-cement ratio of mix design while 30mpa in 7 days?
detailed calculation of the amount of cement used?
How to calculate paint drums per meter square
what pressure the NP2 class RCC pipe can sustain?
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
What is the effect of a building collapse?
What is aggregate?
(Project Management Topic) What are the important criteria in the successful realization of the project?