1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0 = answer??? pzl tell the rite answer ??
Answer Posted / guna
the answer will be 14
1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1+1 + (1 * 0) = 14
this is the program logical arch.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how much cement and sand required for 100sqm of wall plastering in different proportions
what isload waring calculation
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?
Calculation of Pier Cap with tapper area?
what is BPM in concrete demolition hammers. what is better a higher value or lower
how to compute slab reinforcements on step by step procedures??
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
What is labor and material payment bond?
Define What is the meaning of a blue land surveyors flag?
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
What is GSB gradation
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?