1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0 = answer??? pzl tell the rite answer ??
Answer Posted / guna
the answer will be 14
1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1+1 + (1 * 0) = 14
this is the program logical arch.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is thumb rule for calculating the size of ISMB required for a particular length of span
Calculation of Pier Cap with tapper area?
which formula used for calculate the area of segmental arch?
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
How do you calculate reinforcement weight of steel?
In jack arch floor, the rise is kept?
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
cement and sand required for one block of size 0.23*0.15*0.46
Which are the Steel tests ?
Explain the design for rcc multi-storied building?
Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
What is GSB gradation
What are the main reasons for conducting pull-out tests for soil nails?
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.