Stander Size of Brick
Answers were Sorted based on User's Feedback
Answer / dipen
20CMX10CMX10CM
above dim.is with motar
19CMX9CMX9CM without motar size
| Is This Answer Correct ? | 15 Yes | 1 No |
wat is the necessity of finding shear and bending moment in a structure. wat will happen if it is not consider. other than shear cracks and deflection is there any other failure happen.
1 cft of brickwork 1:6 mortar ratio need 12 numbers of bricks so find the quantity of sand and number of cement bags
quantity of cement required for M35 grade reinforced cement concrete
What are the advantages and disadvantages of using plastic and timber fenders?
how many bag of cement needed for concreting 14.93 m3 at the ratio of 1:4:6 and 1:5:6
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
How to calculate construction cost of residential building in mumbai
how much cement and sand required for 100sqm of wall plastering in different proportions
0 Answers Bharti, Pvr Constructions,
how many lab test on bricks and aggregate write briefly please
what is called Bulk Density of aggregate?
What is mean concrete class c35/20. Here C35 and 20 means?
How much cost will come for 900 sq ft cement plastering
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)