Answer Posted / sachin1385
19cmx9cmx9cm
Is This Answer Correct ? | 21 Yes | 1 No |
Post New Answer View All Answers
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
silt%= silt volume/ silt+sand volume is this right?
psc girder detail
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
how do we design mix ratio?
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
what is the specific gravity of rubble in plum concert
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
why building got air crack? if it get in one particular are what is means?
who to find building iron rod strenth
Explain creep?
how to absorb to site basic corrections? which are the important correction?
where tie beam is used? what is the pupose? what dimension of tie beam can provided and number and diameter of steel bars to be used between the columns of 1333mm and 1400.
How is the strength of cement measured?