what is the quantity of formwork in shuttering and barbending is done by 1 mason and 1 helper..

Answer / rajesh n s

Shuttering/Formwork Workdone by 1 Carpenter + 1 helper is 5 to 7 Sqm / day
Barbending by 1 Barnender + 1 Helper is 80 to 100 kg / day

Is This Answer Correct ?    37 Yes 5 No

what is the quantity of formwork in shuttering and barbending is done by 1 mason and 1 helper..

Answer / rajarshi basu

can u prove it technically how it is coming....or it is just based on site exp...

Is This Answer Correct ?    3 Yes 0 No

what is the quantity of formwork in shuttering and barbending is done by 1 mason and 1 helper..

Answer / kamal mukherjee

Is the question technically correct ? General terminology of shuttering workmen is carpenter and steel fixer ins bar bender .
Again the output is linked to the type of the structure in execution.
Broadly Classified as : Sub structure or Super structure
Detailed Classification: Footing, Raft , Column, beam , slab , decorative work: Cantilever, loft, projection works etc..
general working is 2.5-3 sqm of shuttering and 700-750kgs for bar bending works for a pair of workmen

Is This Answer Correct ?    8 Yes 7 No

what is the quantity of formwork in shuttering and barbending is done by 1 mason and 1 helper..

Answer / tarini

1.25

Is This Answer Correct ?    5 Yes 10 No

Post New Answer

More Civil Engineering Interview Questions

How much is anchor length ?

2 Answers  


Explain moment of inertia and its importance.

0 Answers  


what is mean by shear resistance in concrete?

3 Answers   CCCL, Noble Consolidated Glazings, Sobha Developers,


Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used

0 Answers  


Soil will be infertile , When PH value of water will be A] 11 B] 10 C] 9.5

1 Answers  






how to find the cement and sand quantity for wall plastering

1 Answers   SAPL,


what is mean by k150

2 Answers   Kuwait Oil Company,


What are the composition of a landfill?

0 Answers  


can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.

0 Answers   Bhel,


1)pile is of 200mm dia.-- a)tell the cutting length of ring considering 2cm cover b) tell the quantity of concrete considering pile length as 3m c) tell concrete quantity in bulb

3 Answers  


what is Short bored pile foundation.

0 Answers  


in BUILT UP AREA BASIS WHAT IS RATIO OF CONCRTE & STEEL RATIO MAY BE CONCIDER IN PER SQFT QTY

2 Answers   L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)