Answer / rajesh n s
Shuttering/Formwork Workdone by 1 Carpenter + 1 helper is 5 to 7 Sqm / day
Barbending by 1 Barnender + 1 Helper is 80 to 100 kg / day
Is This Answer Correct ? | 37 Yes | 5 No |
Answer / rajarshi basu
can u prove it technically how it is coming....or it is just based on site exp...
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / kamal mukherjee
Is the question technically correct ? General terminology of shuttering workmen is carpenter and steel fixer ins bar bender .
Again the output is linked to the type of the structure in execution.
Broadly Classified as : Sub structure or Super structure
Detailed Classification: Footing, Raft , Column, beam , slab , decorative work: Cantilever, loft, projection works etc..
general working is 2.5-3 sqm of shuttering and 700-750kgs for bar bending works for a pair of workmen
Is This Answer Correct ? | 8 Yes | 7 No |
How much is anchor length ?
Explain moment of inertia and its importance.
what is mean by shear resistance in concrete?
3 Answers CCCL, Noble Consolidated Glazings, Sobha Developers,
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
Soil will be infertile , When PH value of water will be A] 11 B] 10 C] 9.5
how to find the cement and sand quantity for wall plastering
what is mean by k150
What are the composition of a landfill?
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
1)pile is of 200mm dia.-- a)tell the cutting length of ring considering 2cm cover b) tell the quantity of concrete considering pile length as 3m c) tell concrete quantity in bulb
what is Short bored pile foundation.
in BUILT UP AREA BASIS WHAT IS RATIO OF CONCRTE & STEEL RATIO MAY BE CONCIDER IN PER SQFT QTY