what is the quantity of formwork in shuttering and
barbending is done by 1 mason and 1 helper
Answers were Sorted based on User's Feedback
Answer / rajesh n s
Shuttering/Formwork Workdone by 1 Carpenter + 1 helper is 5 to 7 Sqm / day
Barbending by 1 Barnender + 1 Helper is 80 to 100 kg / day
Is This Answer Correct ? | 37 Yes | 5 No |
Answer / rajarshi basu
can u prove it technically how it is coming....or it is just based on site exp...
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / kamal mukherjee
Is the question technically correct ? General terminology of shuttering workmen is carpenter and steel fixer ins bar bender .
Again the output is linked to the type of the structure in execution.
Broadly Classified as : Sub structure or Super structure
Detailed Classification: Footing, Raft , Column, beam , slab , decorative work: Cantilever, loft, projection works etc..
general working is 2.5-3 sqm of shuttering and 700-750kgs for bar bending works for a pair of workmen
Is This Answer Correct ? | 8 Yes | 7 No |
How is rate analysis prepared for M 25 grade of concrete?
how to calculate of m20 c.c road work 1cu.m
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
rasio for outer plaster thickness for wall
Diversion of cum to cft
why we take cube depth 150mm for testing
What is the meaning of Fe415 ?
6 Answers Arul Constructions, L&T, SSM,
what is lap length? why it is required?
time and work questions
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
what is the quantity of cement bag we are use for (18'*9')wall?