what is the quantity of formwork in shuttering and
barbending is done by 1 mason and 1 helper
Answer Posted / tarini
1.25
| Is This Answer Correct ? | 5 Yes | 10 No |
Post New Answer View All Answers
how to tie 10 legged stirrups
What is the ideal size of the living room ranges from small to large size?
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
give me the rate analysis for Bituminous Macadam and SDBC
how can i calculate cement in brickwork
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
What are segregation and bleeding?
difference between trapezoidal and pedestal footing and how the load acts on that
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?
How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density
std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
what is pqc
What is the Roll of Water Bonding under VDF road?
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?