What all are important things keep in mind while designing
and executing the water storage tank works?
Answer / arindam chatterjee
tension is on the inner side at the ends of the walls so
reinforcement should be given on the inner side to prevent
seepage of water.nd outer reinforcement must be provided on
the middle of the walls.the base slab can be designed as a
slab only by redistributing the moments.design must be done
for maximum moment only.
| Is This Answer Correct ? | 3 Yes | 0 No |
In Rcc work what ratio we need?
How to calculate the quantity of water in cement mortar eg. CM 1:3?
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
how to calculate the loads on slab? what are the steps?
how much quantity a carpenter do shuttering per day
19 Answers Nexus Technologies, Tata Projects,
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
What are the different types of civil engineering?
How to calculate water cement ratio in mix desion
Minimum size of the particles of silt soil
What is rolling stock
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)