Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What all are important things keep in mind while designing
and executing the water storage tank works?

Answer Posted / arindam chatterjee

tension is on the inner side at the ends of the walls so
reinforcement should be given on the inner side to prevent
seepage of water.nd outer reinforcement must be provided on
the middle of the walls.the base slab can be designed as a
slab only by redistributing the moments.design must be done
for maximum moment only.

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how i can tak Quantity of mortar in block work

2386


Dear Sir What is the Contraction joint for base Slab

2117


How to calculate chejja reinforcement

2524


How to marking the building

1932


how lap length is increased with increase of Grade of steel?

27002


if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel

1399


what is Short bored pile foundation.

2716


how to calculate spacing rod in column

1952


how to calculate the chair reinforcement length in slabs, footing or anywhere??

2375


i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like

1976


What is rate for brick masonry work of 1.0 m3 in cm 1:6?

1168


Define What is a projection line?

1146


SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?

2715


for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help

2029


How much quantity of cement,sand,stone used to build 1 cum of cc road??

1813