In Rcc work what ratio we need?
Answers were Sorted based on User's Feedback
Answer / adesh kumar
The ratio of R C C work has to be following mix proportion, that is nominal mix:
Cement:Sand:Aggregate-
M 15(1:2:4),
M 20(1:1:5:3),
M 25(1:1:3)
| Is This Answer Correct ? | 2 Yes | 0 No |
why green colour formation on the surface of concrete and plastered surface takes place after curing?
Difference between ton and metric ton
how to creat mix m-20? and how to check shuttering & how is mark layout at open ground
How to calculate sand,cement for 1:5ratio brick masonary
4 Answers IVRCL, Jamek, Prera Nirman Sewa, SPCL,
where you provide on column
What is a deep beam ? Explain ?
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
How to ascertain the required grade of Steel is good for Site .....
how you calculate the qty. of cement ,sand,aggregate from proportion 1:2:4 M15
Define block?
i wanted to know the quantity of cement and water cement ratio for 150mm*150mm*150mm mould.Grade of concret m20
what qualifications did you need to become a civil engineer?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)