In Rcc work what ratio we need?
Answers were Sorted based on User's Feedback
Answer / adesh kumar
The ratio of R C C work has to be following mix proportion, that is nominal mix:
Cement:Sand:Aggregate-
M 15(1:2:4),
M 20(1:1:5:3),
M 25(1:1:3)
| Is This Answer Correct ? | 2 Yes | 0 No |
How to arrive d*d/162 , for finding the kg per meter , wt of steel
How we can calculate the quantity of sand, & cement, & also aggregate for a slab. Length 25'/3.28 = 7.62 Mtr width 20'/3.28 = 6.09 Mtr depth 6" /3.28 = 0.152 Mtr
why in india readymade structure is impossible in residence houses?
quick sand is a type of sand flow condition occuring in cohesive soil flow condition occuring in cohessionless soil all above
how much time will take for G+22 building for completion? activity wise like excavation,sub structure,superstructure,finishing,handover?
Please can anybody let me know how to calculate cement, sand & aggregete content for one meter cube of concrete. please if possible provide calculations for cement in no. of bags, sand & aggregate in cu.mt. Thanks.
How will we calculate the number of cement bags in 6 foot by 6 foot footing?
what is permissible IRC limits of silt content in river sand in India
Describe why concrete must be compacted after it is poured?
How many axes do cartesian coordinate system has?
why we are placing the beam under the plinth wall?
percentage of wastage limits in construction materials EX : min & max . cement = fine aggregate = coarse aggregate = admixture = wood = tiles = painting = marbles = bricks =
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)