In Rcc work what ratio we need?
Answers were Sorted based on User's Feedback
Answer / adesh kumar
The ratio of R C C work has to be following mix proportion, that is nominal mix:
Cement:Sand:Aggregate-
M 15(1:2:4),
M 20(1:1:5:3),
M 25(1:1:3)
| Is This Answer Correct ? | 2 Yes | 0 No |
Difference between ton and metric ton
what is the ideal construction joint for slab?
what is the types of surveying?which type of survey carrying for type of work?
what is density of 20mm coarse aggregate.plz send answer my below adress e.mail
0 Answers NG Constructions, Quaid-e-Azam International Hospital, Shafiq Constructions,
how can calculate cutting length of diamond ring
why we providing 40mm cover to columns & 25mm to shear wall
1) One mason per day how many cu.m work will do as per list given a) Brick work,hollow brick work and cc block work and plastering how many m2 per day 2) one carpenter per day how many m2 will do as well as scaffolding how many m3
12 Answers Al-Futtaim, Arihant, GS, Gulf, L&T, NCC, Paras Buildtech, PR Constructions, Ramco,
How can find weight fosmula in kg/m for circular cylinde steel bar?
what is the weight of wet concrete?
how to calculate the value of 162?
2 Answers GKC Projects Limited GKCPL, L&T, OPG,
what is the design procedure for building
Which IS Code/American Code applied for coupler test of steel
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)