What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
No Answer is Posted For this Question
Be the First to Post Answer
How to calculate density(dry & bulk) of sand from Sp. ravity value of sand. eg. G=2.5
is there zone 6 for earthquake in india? on what basis the naming of the zones are done in variuos countries?
Quality of first class bricks
Which type of question ask for written test for civil diploma trainee
what is the difference between factor of safety and partial safety factor.??
why curing is necessary? Please explain it with detail
what is the formula to calculate costing of rubble soling and wbm in road works?
How to deduct block quantity from the slab quantity for concreting for slab.????
In the cement the compound quickest to react with water
why cylinder for split tensile strength test ?
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
As shown in IS 456-2000 minimum cement content is include fly ash?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)