if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
Civil Engineering 1775if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
Civil Engineering 1795
Question { 6504 }
How much kg of sand,cement will be for 1 sqmt(Blockwork-size 400x200x200)1:4 ratio & same for plaster
Answer
Is This Answer Correct ? | 3 Yes | 0 No |
Question { 8933 }
How calculate the material in concrete mix in ratio 1:2:4 ?
Answer
Is This Answer Correct ? | 3 Yes | 17 No |
Question { 5248 }
quantity of sand in cft in 1:6 cement sand mortar
Answer
Is This Answer Correct ? | 3 Yes | 2 No |
Question { 22817 }
what cement consumction plaster 15mm think per sqmt 1:3&1:6
how much kg.
Answer
Is This Answer Correct ? | 5 Yes | 13 No |