Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is the types of surveying?which type of survey carrying
for type of work?



what is the types of surveying?which type of survey carrying for type of work?..

Answer / purushotham reddy devarapalli

the types of survey are plane survey and geomatic survey...for smaller distance surveys we take plane where as for longer distances it is geomatic survey....

Is This Answer Correct ?    5 Yes 3 No

Post New Answer

More Civil Engineering Interview Questions

how much cement sand n bricks required in im3?and how much in plaster?

0 Answers  


What is the diameter of the 3"inch nails?

0 Answers   Rohan Builders,


difference between deep and shallow well?

7 Answers  


The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.

0 Answers  


contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?

0 Answers  


what is the no. of IS Code?

7 Answers  


how to calculate the quantity of cement,sand and aggregate when the ratio of mixing is 1:2:3

0 Answers   Ajnara Group, Assosa University,


How much quantity of steel will be used for commercial building consists of ground floor shops, first floor shops, second floor will be for offices and third floor will be office/banks. How many tons of steel is required to construct this building.

3 Answers   CRPF,


How many feet are in 4 square yards?

0 Answers  


What is the lapping length for 32mm steel rod as per BS standards?

4 Answers  


How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton

0 Answers  


the construction of building in that primary thing is dig the soil which what depth will dig in stiff soil

1 Answers   L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)